SAILAsterix
A FREEDOM 40 · A NEW CHAPTER

Getting ready for sea

Asterix · The refit chapter

Getting ready
for sea.

Before the passages come the practical jobs. This is the continuing record of making Asterix seaworthy, dependable and comfortable enough to call home.

Refit in progressOxnard, CaliforniaUpdated 15 November 2026

The refit is our first adventure aboard Asterix. Each project follows a job from its starting point through the work, decisions and checks that bring it to completion.

The Journal tells the dated story of life aboard. These project records bring the work together across visits.

Refitted headlining panels in the aft cabin

Week four · 9–15 November 2026

Headlinings and heads

New marine vinyl, the completed aft cabin headlinings and a brighter, more useful heads.

Completed 12V power socket in the cockpit deck box

Week four · 9–15 November 2026

Odd Jobs

The smaller improvements: cockpit power, deck repairs, mattress improvements and the tide-clock repair.

The wooden sprayhood bridge refitted on Asterix

Repair carried out · rain check pending

Deck leaks and headlining

Tracing the water above the chart table, refitting the wooden sprayhood bridge and preparing replacement headlining.

Refrigeration service equipment and gauges aboard Asterix

Repairs carried out · performance testing continues

Fridge and freezer

A replacement compressor and expansion valve, brazing and leak testing, repaired seals and the latest temperature and power measurements.

Fantasy at her berth, showing the mizzen mast

Two coats complete · masthead work ahead

Mizzen mast restoration

Old fittings removed, holes filled and two coats of lamp-black epoxy applied. The story from preparation to the fresh finish.

Amanda preparing replacement main-mast track on deck

Mast painted · replacement track fitted

Main mast restoration

From the corroded old track through sanding and painting to the replacement track fitted in November.

Restored teak cockpit trim after Semco treatment

Repairs, cleaning and treatment complete

Teak restoration

Amanda’s teak campaign: old varnish removed, plugs replaced, repairs filled and three coats of Semco Clear applied.

The blue Perkins engine aboard Asterix

Gearbox refitted · dockside test successful

Engine and gearbox

The engine work and gearbox rebuild, followed by the November refit and a sustained dockside run at 1,500 rpm without the previous shaft binding.