SAILAsterix
A FREEDOM 40 · A NEW CHAPTER

Engine and gearbox

Asterix · Propulsion · Refit in Oxnard

Engine and gearbox.
Getting drive back.

Cleaning the fuel system, rebuilding the gearbox, renewing seals and restoring the cooling system. The gearbox is back aboard. A sustained dockside run at 1,500 rpm brought no recurrence of the previous shaft binding — a major step forward, with an underway trial still ahead.

Refitted · dockside test successfulPhotographic record: February–November 2026Last update: 15 November 2026
11 July 2026The Perkins aboard Asterix during the summer work.

Current position · 15 November 2026

Engine work completed so far: fuel tank and fuel cleaned; fuel delivery and filtering attended to; rear oil seal replaced; cooling system renovated; timing housing and cover resealed; sealing washers renewed; four new engine mounts fitted and engine aligned; temperature sender matched to the gauge.

Gearbox: previously fully rebuilt internally by Brad. Refitted with Brad on 12 November. A sustained dockside run at 1,500 rpm showed none of the previous binding; cockpit control direction is now forward for forward and back for reverse.

Still to prove: operation underway. The dockside result is encouraging; the precise cause of the earlier binding remains unconfirmed.

The installation we began with.

Before she became Asterix, she was Fantasy. The first-inspection and owner-photo archive from February 2026 records the boat at the beginning of this project.

Her Perkins 4.108 and Hurth gearbox were already in place. The photographs show worn blue paint and surface corrosion on the engine, together with the original gearbox, coupling and waterlock exhaust arrangement behind it.

These are the starting-point photographs for our work. They let us compare the installation then with the stages of dismantling, preparation, reassembly and testing that followed.

14 February 2026 · 12:22Engine and wiring look like they need attention
14 February 2026The engine as photographed at the start of the project.
18 February 2026The gearbox and exhaust arrangement in the first-inspection archive.

Working through the engine and its systems.

The engine work began with the fuel. Pretty much on day one, we emptied the tank, cleaned it out and polished the fuel. That gave us a starting point for sorting out the fuel delivery and filtering.

Fuel supply and filtering

With the tank clean and the fuel polished, we dealt with the lift pump and sorted out the fuel filtering system.

Gearbox rebuild and rear oil seal

Brad removed the gearbox and carried out a full internal rebuild. With the gearbox out, we also removed the bellhousing and flywheel to expose the engine’s rear oil seal, which we replaced.

That rebuild was part of the earlier refit work. The gearbox’s latest trip back to Brad’s workshop is a later stage of the investigation, covered below.

Heat exchanger, pipework and water pump

We renovated the heat exchanger and renewed the associated pipework. The water pump was reconditioned with renewed internals and seals, and the raw-water filter was renewed.

Timing housing, cover and sealing washers

At the front of the engine, we worked through the timing housing and cover, resealing the cover lid. We also replaced a number of crush washers and other single-use sealing washers around the engine.

Four new engine mounts and alignment

We fitted four new engine mounts and aligned the engine.

A temperature sender that matches the gauge

We replaced the temperature sender with one whose resistance characteristics matched the existing dial. Getting the sender and gauge working together was another part of making the engine instruments useful again.

6 July 2026Working on the engine also means opening up the boat around it.
10 July 2026The front timing case open during the July work.

There has been a lot of work behind the fresh blue paint: fuel, cooling, seals, the gearbox and the instruments. With those jobs done, the remaining focus is the behaviour of the complete drive when it is running under load.

The problem appears under load.

Getting the engine running brought us to the next question: could we rely on the drive?

During the summer testing after the internal rebuild, the Hurth gearbox gave smooth forward operation at about 1,000 rpm. At around 1,500 rpm, the shaft shuddered and the gear lever became too tight to move. That left an unresolved problem somewhere in the drive system.

The investigation considered the gearbox itself as well as the shaft, alignment and loading. The precise cause remained uncertain. The successful November refit and dockside test are recorded below.

By the autumn visit, dependable propulsion was still one of the jobs standing between Asterix and getting ready for sea.

The gearbox goes back to the workshop.

Brad joined me midweek and we removed the gearbox together. He took it back to his workshop to investigate and put it back together.

There was no obvious fault to point to, which was frustrating. It would have been reassuring to find something definite. The plan is to reseal and reassemble it, then return it for refitting.

At the time of the 8 November log, we were hoping to have it back towards the end of the following week or the week after. The result will only become clear once it is back aboard and tested.

29 October 2026Access to the rear of the engine during the autumn investigation.
6 November 2026The damper plate at the engine-to-gearbox connection.

The October photograph records an earlier stage of access to the engine. The latest removal is described as “midweek” in the 1–8 November log; its exact day has not been fixed.

Back aboard, and running sweetly.

Brad returned on Thursday afternoon and together we fitted the gearbox and connected the shaft. The cockpit control now selects forward when the lever is raised and reverse when it is moved back, a change from the arrangement after the previous refurbishment.

We ran the engine in gear at 1,500 rpm for a sustained period. The previous shaft binding did not recur, and it sounded sweet. It was an enormous relief to have propulsion working again.

We cannot say exactly what cured the problem. Brad had worked inside the gearbox, and the diver had replaced the shaft zinc while it was away. An old zinc or clamp was discussed as a possible contributor, but that remains speculation.

The result gives us confidence to plan the move to the yard under our own power later in the month. An underway trial is still to come.

12 November 2026The engine compartment during Thursday’s gearbox refit
12 November 2026Brad working in the engine compartment during the gearbox refit

The installation and completed work.

Component Recorded identification
Engine Perkins 4.108 marine diesel
Gearbox Hurth HBW 10-215R
Reduction 2.15:1
Drive connection Spring-type damper plate between the engine flywheel and gearbox
Gearbox work Full internal rebuild by Brad during the earlier refit
Rear oil seal Replaced after removal of bellhousing and flywheel
Fuel system Tank emptied and cleaned; fuel polished; lift pump and filtering attended to
Cooling Heat exchanger renovated; associated pipework renewed; water-pump internals and seals renewed; raw-water filter renewed
Oil sealing Timing housing and cover resealed; crush and other single-use sealing washers replaced
Engine mounts and alignment Four new engine mounts fitted; engine aligned
Temperature indication Sender replaced to match the gauge’s resistance characteristics

This records Asterix’s existing equipment. A replacement gearbox has been considered, but no alternative unit is recorded as installed.

Prove it underway.

The refit and dockside test are complete. Next comes checking the drive under real operating conditions, recording gear selection, temperatures, leakage and any return of the previous symptoms. We will add the result of the trip to the yard when it happens.