Headlinings and heads
Oxnard · 9–15 November 2026
A brighter cabin.
A more useful heads.
New vinyl, carefully fitted panels and a few practical changes to the way we live aboard.
A second attempt at the headlinings
The first coverings went up during Trip Two. When we returned on Trip Three, they had largely come away. The contact adhesive and the original floor vinyl had not made a successful combination.
Amanda and I researched a different approach: proper headlining vinyl from Marine Vinyl Fabrics and waterproof PVA adhesive. Small tests looked promising, so this week we began again. This records our own installation; the adhesive’s durability still needs time to prove itself.
Working on the dock
9 November. We cleaned the reusable boards, rolled out the vinyl, spread the adhesive carefully and worked to avoid trapped air or lumps of glue. Amanda did the covering, and the larger panels dried in the sunshine.
The difficult pieces around the mast
10–11 November. I shaped the awkward pieces around the mizzen deck collar and its bolts, dry-fitted them and prepared them for covering. By Wednesday the aft cabin panels were back in, with supporting pieces, trim and lights refitted.
Three pieces in the heads
11–12 November. I cut out the old damaged heads panels with the multitool, leaving the hatch frame in place. Making the replacements in three pieces rather than two allowed them to fit around it. Before covering them, I dry-fitted the new plywood and filled redundant holes above.
Covering, lighting and a dressing surface
12–13 November. Amanda covered the heads panels while Brad and I worked on the gearbox. Once the panels were refitted, I replaced the fluorescent fitting with two LED tubes at different angles.
We shaped a removable board over the sinks to give Amanda a useful dressing surface beneath the mirror. The lighting and board make the space much more practical.
A final trim — and the next cabin
15 November. I made the final joint trim from white oak because teak was not available, treated it with Semco and fitted it. Some further woodwork remains in the heads.
The aft cabin headlinings are complete. We have bought eighth-inch plywood sheets and have the vinyl ready for the main saloon next week.