Odd Jobs
Oxnard · 9–15 November 2026
Odd jobs.
The little things add up.
Small repairs, useful improvements and the finishing touches of life aboard.
A growing record of the smaller jobs that make Asterix more comfortable and practical. Each entry records what we did, when we did it and what remains to finish.
Cockpit power for the GPS
9–15 November 2026. I removed the old autopilot cable and ran a new 12V supply from the starboard lighting loom, routing and clipping it beneath the deck to the sloping wooden box in the cockpit. The new socket is now fitted and the installation is complete. It gives us a power supply at the planned position for the Garmin GPSMAP 265.
Bowsprit joints and anchor swivel
9 November 2026. I raked the old filling and sealant out of the bowsprit joints and fitted a new swivel to the anchor. The joints are prepared for resealing; applying the new sealant remains outstanding.
Filling redundant deck holes
12 November 2026. With the heads headlining down, I mixed epoxy and filled redundant screw and through-bolt holes. It was a useful opportunity to finish these small repairs before the new panels went back in.
A new movement for the tide clock
13 November 2026. I dismantled the non-working tide clock and ordered a replacement movement. The repair will continue when the part arrives.
A little more room in the bunk
14–15 November 2026. The new three-inch foam trial bottomed out, so we cut the original five-inch latex mattress down to three inches and refitted it with a topper. The layers are now in a cover, the bunk is comfortable and I have more footroom.
Hooks, screws and the bunk curtain
15 November 2026. We bought small screws, stainless hooks and bungee cord for the bunk curtain and the remaining finishing jobs. These purchases are preparation; the fitting work is still to be recorded.