Making cold.
Making it last.

A new compressor, a replacement expansion valve, repaired seals and many hours of testing. Bringing Asterix’s holding-plate fridge and freezer back into useful service.

In progressFebruary–November 2026Updated 8 November 2026
12 June 2026 · 14:45Refrigeration service equipment aboard during the June work.

Current position · 8 November 2026

Completed: compressor replaced in July; fridge seals repaired; single thermostatic expansion valve replaced on 31 October; brazing work by Brian on three occasions; nitrogen leak testing, vacuum evacuation, charging and further running tests.

Progress: both plates now get cold. In our week-three shorthand, we have “a fridge that works and a freezer that nearly works.”

Still to prove: dependable compartment temperatures, a fully charged holding plate and useful holdover between compressor runs. The freezer is not yet a proven deep freezer.

Keep the boxes.
Understand the machinery.

The fridge and freezer were already built into the boat when she was still Fantasy, with stainless holding plates inside the compartments and refrigeration machinery elsewhere aboard. These two photographs from 14 February show the original compressor section at the start of the project, before the compressor replacement and later repairs.

Our task has been to understand that existing installation and make it useful again. Cold drinks alongside are welcome, but the real objective is dependable refrigeration when we are cruising, with a sensible demand on the batteries.

14 February 2026 · FantasyThe compressor section through the access opening, as it was at our first inspection.
14 February 2026 · FantasyA closer view of the original compressor and surrounding pipework before our refit work.

The work has taken several stages. Replacing the compressor brought one major component up to date, but did not settle the behaviour of the complete system. We still had uneven cooling, questions about refrigerant flow and charge, and seals that needed attention.

One circuit. Two holding plates.

Asterix’s installation uses a 12-volt BD50F compressor, R134a refrigerant and a seawater-cooled condenser. It has a single expansion valve feeding the freezer plate first, then the fridge plate, before the refrigerant returns to the compressor.

Compressor → seawater condenser → liquid receiver → pressure switch → filter drier → sight glass → single TXV → freezer plate → fridge plate → compressor

The thermostatic expansion valve, or TXV, meters refrigerant into the low-pressure side. Because the plates share a circuit, a problem with refrigerant supply can affect the balance between both compartments.

The plates are our cold store

These are holding plates, containing a solution intended to freeze while the compressor runs. As that frozen solution later melts, it absorbs heat from the box. That is the storage we hope to use between runs.

A cold metal surface is encouraging, but it does not establish that the solution inside has fully frozen. Nor is a plate temperature the same thing as the air temperature around the food. Those distinctions have become central to understanding our test results.

Working through the whole installation.

July: a replacement compressor

We replaced the compressor with a BD50F in July. The existing holding plates and seawater condenser stayed in the system. Later tests still showed uneven progress: the freezer plate cooled and frost reached towards the fridge, but the fridge plate did not appear to freeze as we wanted.

We investigated replacement-system options as well. For now, we have continued working with the newly fitted compressor and the existing installation, trying to establish what it can actually do.

The compressor installation

The photographs below show the compressor and a close view of the sight glass used during our checks.

7 November 2026The compressor installation during the November testing. The new compressor had been fitted in July.
25 July 2026An earlier view of the sight glass and its position in the pipework.
7 November 2026The sight glass was one observation among several; its appearance alone could not establish the correct charge.

30 October: attend to the fridge seals

The day before Brian’s visit, we sorted out the fridge seals. Bonding the EPDM rubber was a fiddly job. The sealant appeared to grip well, and we will see how the repair holds up in service. Keeping warm air out is another part of giving the machinery a fair chance.

Finding leaks and repairing the pipework

Brian’s work has involved more than changing components. He has carried out brazing work on three occasions as we worked through the refrigeration circuit. We used nitrogen to pressurise the system and identify leaks, so that those joints and connections could be attended to before putting refrigerant back in.

Pressure testing and pulling a vacuum are distinct stages. The nitrogen test lets us look for leaks under positive pressure. After the repairs and pressure testing, Brian pulled the system down under vacuum before charging it. Evacuation removes air and moisture from the circuit; simply adding more refrigerant would not replace that preparation.

31 October: Brian replaces the expansion valve

Brian gave us several hours on the Saturday. He replaced the single TXV serving the fridge/freezer circuit, pressure-tested the system with nitrogen to check for leaks, then pulled a vacuum before adding refrigerant. We ran it for about six hours that day.

That was a major step. We had been looking at the compressor, valve, pipework and plate behaviour for long enough that getting the system running again felt like real progress.

1 November: charging and watching

On Sunday I continued running and monitoring the installation, adding refrigerant in stages and then recovering a small amount. The recorded estimate at the end was 10¾ ounces, approximately 305 grams, of R134a.

That is the provisional charge recorded for our particular installation at this stage. It is not a manufacturer’s charging specification. Since then we have watched the temperatures, current draw and behaviour over longer runs, rather than calling the job finished after one successful start.

Cold plates are only part of the answer.

On 7 November we ran the compressor continuously from 05:50 until 12:00: six hours and ten minutes. The notes show a substantial fall in both plate readings, while the compartment air cooled more slowly.

Recorded readings · 7 November 2026 · °C
Measurement 05:50 12:00
Fridge air 9.2 5.3
Freezer air 7.9 −1.5
Fridge plate · indicative IR surface 6.2 −14.3
Freezer plate · indicative IR surface 3.2 −13.0

These are our recorded observations, rather than calibrated performance figures. The inexpensive air sensors need checking, and the infrared plate measurements have important limitations.

7 November 2026 · After shutdownThe fridge holding plate, photographed after the test run had ended.
7 November 2026 · After shutdownThe freezer holding plate after shutdown. Visible frost does not tell us how much cold the plate has stored.

The useful result is that both plates became substantially colder. The unresolved part is that, after that long run, the recorded freezer air was only a little below zero. That does not yet demonstrate the freezer performance we want for cruising.

Learning what the thermometer can tell us

We used an infrared thermometer on small black marker dots on the stainless plates. At the measuring distances, its viewing area was wider than each dot, so readings also included surrounding shiny metal or frost. That helps explain why the numbers could vary. A changing IR reading on its own cannot establish that the expansion valve is hunting.

We need more reliable contact measurements and a better understanding of the holding solution’s freezing point before deciding how fully the plates are charging. The after-shutdown photographs document the condition of the plates; they do not measure their stored cooling capacity.

Frost and the sight glass

The suction line showed heavy frost during testing. We also watched the sight glass, including occasional bubbles. Both are useful observations to record alongside temperatures and pressures, but neither gives us a complete diagnosis or a charging instruction.

In particular, the point where frost stops does not settle whether liquid refrigerant could be returning towards the compressor. Establishing superheat requires a reliable suction-line temperature and the corresponding pressure at the same time. That is a more useful next measurement than judging the system from frost alone.

What does it cost to run?

On 1 November we checked the DC load with the AC supply removed and allowed the readings to settle. The final record showed 13.04 volts and 9.5 amps total boat load. With approximately 1.12 amps of background demand, the increase attributable to refrigeration was about 8.38 amps.

One recorded operating point · 1 November 2026
Battery voltage 13.04 V
Total DC current 9.50 A
Background current Approximately 1.12 A
Incremental refrigeration load Approximately 8.38 A / 109 W

At that measured load, two hours of running would use roughly 17 amp-hours, and four hours roughly 34 amp-hours. Those are simple illustrations at one operating point; the daily energy requirement depends on how long the compressor actually runs and how the system behaves as conditions change.

The eventual aim is to take advantage of engine-running time. If we motor out of a harbour for two to four hours, that may be a useful opportunity to charge the plates. It still represents an electrical load, and we have not yet shown that an average of two hours a day will be enough.

Now we need to prove the holdover.

The next stage is to connect the mechanical progress to the way we will actually use the boat: load the compartments realistically, establish a repeatable charging run, then switch the compressor off and measure how long useful temperatures last.

  • Check the air sensors and obtain reliable contact temperatures on the plates and suction line.
  • Establish the holding solution’s freezing behaviour and whether the plates are fully charging.
  • Record fridge and freezer air temperatures through a controlled run and the following period with the compressor off.
  • Test with a representative food load, noting ambient conditions and lid openings.
  • Use those results to decide the running pattern and any further work required.

For now, the new compressor, valve work and repaired seals have moved us forward. The fridge is useful again and the freezer is getting closer. The final test is whether we can store enough cold to make the whole arrangement dependable between runs.