{"id":54,"date":"2026-10-12T21:02:17","date_gmt":"2026-10-12T21:02:17","guid":{"rendered":"https:\/\/sailasterix.com\/?page_id=54"},"modified":"2026-10-12T21:02:17","modified_gmt":"2026-10-12T21:02:17","slug":"pegasus-pegasus-log-in-brief","status":"publish","type":"page","link":"https:\/\/sailasterix.com\/?page_id=54","title":{"rendered":"Pegasus log in brief"},"content":{"rendered":"<section class=\"wrap voyage-heading\">\n<p class=\"eyebrow\"><a href=\"https:\/\/sailasterix.com\/?page_id=74\">PEGASUS<\/a> \/ OUR SAILING STORY<\/p>\n<h1>Pegasus log in brief<\/h1>\n<p class=\"lead\">An original account from our years aboard Pegasus.<\/p>\n<\/section>\n<article class=\"article-copy legacy-pegasus-copy\">\n<p><strong><em>Pegasus Log in Brief<\/em><\/strong><\/p>\n<p><strong><em>\u00a0<\/em><\/strong><\/p>\n<p><b><i>June 2013 to July 2014<\/i><\/b><\/p>\n<p>Pegasus alongside in Cowes, Isle of Wight. Sold in July 2014 to a German national who carried out a refit in Cowes and sailed her back to Germany. <\/p>\n<p>I understand that he plans to winter in Germany and set off in 2015 for the Mediterranean.<\/p>\n<p><b><i>May to June 2013<\/i><\/b><\/p>\n<p>New sails bought in St Lucia and transat back to Cowes in the UK. 22 Day light wind passage<\/p>\n<p><b><i>January to\u00a0May 2013.<\/i><\/b><\/p>\n<p>Pegasus at anchor in Grenada. Plans afoot to get her moving again with a possible Transat, Crusie in the Azores and back to England for the summer.<\/p>\n<p><strong><em>December 2012 to January 2013<\/em><\/strong><\/p>\n<p>Christmas cruise. Sail up to Bequia for Christmas with friends. Slowly sail back to Grenada via Mustique, Tobago Cays and Carriacaou arriving early January.<\/p>\n<p><strong><em><\/em><\/strong>\u00a0<\/p>\n<p><strong><em>June 2012 to December 2012<\/em><\/strong><\/p>\n<p>Internal refit. Paint with 2 part varnish all woodwork and 3 part Awlgrip all white internal surfaces and walls etc. Replace house batteries and modify chart table area.etc.<\/p>\n<p><b><i>January\u00a0 to June 2012<\/i><\/b><\/p>\n<p>Trans Atlantic to Grenada. (18 days) Cruise up the Caribbean chain and back down to Grenada for the Wet Season.<\/p>\n<p><b><i>\u00a0<\/i><\/b><\/p>\n<p><b><i>December 2011<\/i><\/b><\/p>\n<p>Haul out and refit in Lanzarote. Coppercoat antifouling system, Awlgrip both hulls and new boot stripe. Other various maintenance jobs, pump replacement, filter changes etc.<\/p>\n<p><b><i>\u00a0<\/i><\/b><\/p>\n<p><b><i>September to December 2011<\/i><\/b><\/p>\n<p>Cruise from the UK to Spain, Portugal and on to the Canaries via Morocco. <\/p>\n<p><b><i>June to August 2011<\/i><\/b><\/p>\n<p>Cruise up the W coast of Portugal and on to the UK for August and the summer.<\/p>\n<p><b><i>\u00a0<\/i><\/b><\/p>\n<p><b><i>March to June 2011<\/i><\/b><\/p>\n<p>Cruise up through Suez and on through Cyprus, Greece, Turkey, Italy, Sardinia, Balearic Islands and on to Spain and Gibraltar.<\/p>\n<p><b><i>February to March 2011<\/i><\/b><\/p>\n<p>Sail singlehanded from Maldives to Egypt via Aden (Yemen) Eritrea and Sudan. Replace both raw water pumps on engines.<\/p>\n<p><b><i>January to February 2011<\/i><\/b><\/p>\n<p>Cruise to Sri Lanka and then on to Maldives.<\/p>\n<p><b><i>November to December 2010<\/i><\/b><\/p>\n<p>Cruise up the coast of Malaysia to Langkawi and on up into Thailand and to Phuket for Christmas and New Year.<\/p>\n<p><b><i>July to November 2010<\/i><\/b><\/p>\n<p>Cruise up through Indonesia to Banda and down to Komodo. On to Sumbawa, Lombok and Bali. Up into the Kumai (orang-utans)\u00a0 and on to Belitung and up to Singapore.<\/p>\n<p><b><i>\u00a0<\/i><\/b><\/p>\n<p><b><i>March to July 2010<\/i><\/b><\/p>\n<p>Haul out and antifoul in Perth. Some touch up painting. Replace hydraulic seals on stearing and general maintenance. Up the West coast. Past NW point and on to Dampier, the Rolly shoals and up into the Kimberley. On to Darwin.<\/p>\n<p><b><i>\u00a0<\/i><\/b><\/p>\n<p><b><i>January to March 2010<\/i><\/b><\/p>\n<p>Cruise South and West, through the Bass straight, up into Adelaide, through the 2 gulfs and across the Great Australian bight. On to Perth <\/p>\n<p><b><i>\u00a0<\/i><\/b><\/p>\n<p><b><i>November to December 2009<\/i><\/b><\/p>\n<p>Cruise South down coast of Australia to the Hawkesbury and on to Sydney for new years eve.<\/p>\n<p><b><i>July to November 2009<\/i><\/b><\/p>\n<p>Cruise through Tonga, Fiji, New Caledonia and on to Bundaberg, Australia.<\/p>\n<p><b><i>\u00a0<\/i><\/b><\/p>\n<p><b><i>April to July 2009<\/i><\/b><\/p>\n<p>Cruise to the Galapagos and on to the Marquesas (18 days), Tuamotoes and on to the society\u2019s and N Cook Islands.<\/p>\n<p><b><i>\u00a0<\/i><\/b><\/p>\n<p><b><i>February to April 2009<\/i><\/b><\/p>\n<p>Cruised through Bonaire, Curacao, Aruba, on to Cartagena and the San Blas. Through Panama canal and on to Las Pearls islands<b><i><br \/>\n<\/i><\/b><\/p>\n<p><b><i>\u00a0<\/i><\/b><\/p>\n<p><b><i>December 2008 to February 2009<\/i><\/b><\/p>\n<p>Trans Atlantic to Grenada. (16 days)Cruised southern part of the Caribbean.<\/p>\n<p><b><i>September to December 2008<\/i><\/b><\/p>\n<p>Sail to the Canaries via Spain, Portugal and Madeira. Haul out and refit for painting.. Mast repainted, hulls antifoul and new boot stripe painted. Some touch up painting on hulls under bridge deck.<\/p>\n<p><b><i>June to September 2008<\/i><\/b><\/p>\n<p>Trans Atlantic to the UK via the Azores. Some time on the S coast of the UK.<\/p>\n<p><b><i>February 2008 to May 2008<\/i><\/b><\/p>\n<p>Sail down the intercoastal waterway and cruised extensively through the Bahamas.<\/p>\n<p><b><i>\u00a0<\/i><\/b><\/p>\n<p><b><i>November 2007 to February 2008<\/i><\/b><\/p>\n<p>Refit at Lombardi Yachts in Chesapeake. All major systems refurbished, some\u00a0 woodwork repair, custom woodwork, installation of solar panels, installation of shore power, electrics\u00a0and water distribution, some painting. <\/p>\n<p><b><i>\u00a0<\/i><\/b><\/p>\n<p><b><i>November 2007<\/i><\/b><\/p>\n<p>Sail Pegasus from Portsmouth NH to Norfolk Virginia<\/p>\n<p><b><i>\u00a0<\/i><\/b><\/p>\n<p><b><i>October to November 2007<\/i><\/b><\/p>\n<p>Commission yard to install new engines and get systems operational<\/p>\n<p><b><i>\u00a0<\/i><\/b><\/p>\n<p><b><i>September 2007<\/i><\/b><\/p>\n<p>Complete purchase of Pegasus<\/p>\n<p><b><i>\u00a0<\/i><\/b><\/p>\n<p><b><i>August 2007<\/i><\/b><\/p>\n<p>View Pegasus in Yard, Portsmouth New Hampshire<\/p>\n<p><a class=\"text-link\" href=\"https:\/\/sailasterix.com\/?page_id=74\">\u2190 Back to the Pegasus chapters<\/a><\/p>\n<\/article>\n","protected":false},"excerpt":{"rendered":"<p>PEGASUS \/ OUR SAILING STORY Pegasus log in brief An original account from our years aboard Pegasus. Pegasus Log in Brief \u00a0 June 2013 to July 2014 Pegasus alongside in Cowes, Isle of Wight. Sold in July 2014 to a German national who carried out a refit in Cowes and sailed her back to Germany. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-54","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/sailasterix.com\/index.php?rest_route=\/wp\/v2\/pages\/54","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sailasterix.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/sailasterix.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/sailasterix.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sailasterix.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=54"}],"version-history":[{"count":1,"href":"https:\/\/sailasterix.com\/index.php?rest_route=\/wp\/v2\/pages\/54\/revisions"}],"predecessor-version":[{"id":259,"href":"https:\/\/sailasterix.com\/index.php?rest_route=\/wp\/v2\/pages\/54\/revisions\/259"}],"wp:attachment":[{"href":"https:\/\/sailasterix.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=54"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}