Trip 04 · Week four
Updated 15 November 2026
11 November 2026Aft cabin headlinings refitted, with the trim and lights back in place

A second attempt at the headlinings

The first coverings went up during Trip Two. When we returned on Trip Three, they had largely come away. The contact adhesive and the original floor vinyl had not made a successful combination.

Amanda and I researched a different approach: proper headlining vinyl from Marine Vinyl Fabrics and waterproof PVA adhesive. Small tests looked promising, so this week we began again. This records our own installation; the adhesive’s durability still needs time to prove itself.

Working on the dock

9 November. We cleaned the reusable boards, rolled out the vinyl, spread the adhesive carefully and worked to avoid trapped air or lumps of glue. Amanda did the covering, and the larger panels dried in the sunshine.

9 November 2026Headlining panels drying on the dock

The difficult pieces around the mast

10–11 November. I shaped the awkward pieces around the mizzen deck collar and its bolts, dry-fitted them and prepared them for covering. By Wednesday the aft cabin panels were back in, with supporting pieces, trim and lights refitted.

10 November 2026Working around the mizzen deck collar with the headlining removed
11 November 2026Aft cabin headlinings refitted, with the trim and lights back in place

Three pieces in the heads

11–12 November. I cut out the old damaged heads panels with the multitool, leaving the hatch frame in place. Making the replacements in three pieces rather than two allowed them to fit around it. Before covering them, I dry-fitted the new plywood and filled redundant holes above.

11 November 2026Old headlining panels coming down in the heads
12 November 2026New plywood panel dry-fitted around the heads hatch

Covering, lighting and a dressing surface

12–13 November. Amanda covered the heads panels while Brad and I worked on the gearbox. Once the panels were refitted, I replaced the fluorescent fitting with two LED tubes at different angles.

We shaped a removable board over the sinks to give Amanda a useful dressing surface beneath the mirror. The lighting and board make the space much more practical.

13 November 2026The covered heads panels back in, with the new LED lighting
13 November 2026The new removable dressing board over the heads sinks
Aft cabin complete · heads panels fitted · saloon next

A final trim — and the next cabin

15 November. I made the final joint trim from white oak because teak was not available, treated it with Semco and fitted it. Some further woodwork remains in the heads.

The aft cabin headlinings are complete. We have bought eighth-inch plywood sheets and have the vinyl ready for the main saloon next week.