Up the masts. Back to the teak. — Asterix week three

California · The refit chapter

Up the masts.
Back to the teak.

A busy week aboard Asterix: the main mast track is fitted, the mizzen has two coats of black epoxy paint, and Amanda brings the teak back to life.

1–8 November 2026
Oxnard, California
Words: Jason
Trip 04 · Week three
6 November 2026Amanda at work on the teak around the mizzen.

Amanda and I have had a busy week aboard Asterix. Some of the big jobs have finally reached a satisfying stopping point: the new main mast track is fitted, the mizzen has two coats of black epoxy paint, and the exterior teak has been repaired, cleaned and sealed. There have been plenty of smaller jobs around them, too. They all add to the whole.

A fridge that works, and a freezer that nearly works

The refrigeration work began at the end of the previous week. On Saturday 31 October, Brian gave us a few hours of his time to replace the expansion valve serving the fridge and freezer. He pressure-tested the system for leaks, evacuated it and put in an initial refrigerant charge before we gave it a long run.

The day before, we had also tackled the fridge seals. Getting the rubber to stick had proved surprisingly awkward, but the roofing sealant we used finally seemed to bond it well. Whether it holds up over time is something we will report back on.

On Sunday 1 November, I continued working through the refrigerant charge and monitoring the system. Our estimated final charge was about 10¾ ounces. Since then, I have been checking temperatures and watching how the plates and boxes cool.

We now seem to have a fridge that works and a freezer that nearly works. That feels like a major step forward after all the effort that has gone into it, although we still need to establish how well the holding plates will perform in normal use. Getting the plates cold is one thing; keeping the contents cold between runs is the next part of the story.

Brian came back on Friday morning, and we agreed that it was time for him to send in his invoice. There is still some testing ahead, but we have reached a much more encouraging point.

31 October 2026Brian aboard during the refrigeration work.

Two coats on the mizzen

I had prepared the mizzen at the end of last week, filling redundant holes, but inevitably found a couple I had missed. Monday began with another trip up to finish the filling and sanding, wash the mast and get it ready for paint.

The mizzen halyard entry fitting also needed riveting back into place. The riveter would not grip properly, which meant another trip to Harbor Freight for a replacement. While the riveting gear was out, we secured the cockpit lights as well.

Painting from a bosun’s chair takes a little organisation. I measured the epoxy components into syringes so I could mix small batches while working down the mast. At the top, I cleaned and spray-painted the truck, then came down applying the first coat of lamp-black epoxy paint to the mast.

Tuesday brought the second coat and a couple of stainless rivets in the collar. It was windy, and one of the paint trays caught the wind and spilled a little. Mixing smaller batches helped keep things manageable. By the end of the day, the mizzen had its two coats and looked terrific. A very satisfying milestone.

29 October 2026Working aloft from the bosun’s chair. An earlier photograph from this trip illustrates the mast work.
3 November 2026Small batches, prepared below before working aloft.
3 November 2026Two coats on the mizzen: a satisfying milestone.

The main mast track is finally on

The new main mast track proved every bit as fiddly as expected. There were about eight and a half sections to fit, with roughly 150 screws, and almost every hole needed some adjustment to line up with the inserts in the mast.

After going to the top to look at the job, I started fitting the sections from the bottom. The system that worked was to ease the holes in the track where necessary, then use a 10-24 tap to clear any remaining aluminium obstructing the threads. Progress was slow, but the sections began to go on.

Amanda prepared the lengths on deck and sent them up to me. By Thursday, we were working through the final sections. One insert, at the fourth hole from the top, needed replacing and bedding back in epoxy. That is an awkward job from a bosun’s chair, although by then I had had plenty of practice mixing epoxy aloft.

By the finish, all the sections were fitted and the fixings secured. It was an enormous relief to have the track done. Thursday evening’s steak and potatoes aboard felt well earned.

4 November 2026Amanda preparing the track sections on deck and keeping the work moving below.
5 November 2026Steak and sautéed potatoes aboard, after the main mast track was finished.

The gearbox goes ashore

Brad joined us midweek and we removed the gearbox together. He has taken it back to his workshop.

There was no obvious fault to point to, which is frustrating. It would have been reassuring to find something definite. The plan is for him to reseal it, put it back together and return it for refitting, hopefully towards the end of next week or the following week. We will only know how effective that has been once it is back aboard and tested.

Amanda’s teak campaign

While I was going up and down the masts, Amanda was steadily transforming the teak, principally around the cockpit.

She had already used a heat gun and scraper to remove the old varnish. This week brought two-part cleaning, repairs and the preparation needed before sealing. There were around nine or ten missing plugs to replace. Amanda cleaned the old epoxy out of the holes, and the teak plugs we collected from West Marine fitted nicely after a little drilling where needed.

I patched other small holes using an adhesive mix darkened with saved teak dust. Amanda trimmed and sanded the plugs, and we worked through the final cleaning until everything was smooth and ready.

Sunday was Semco day. We gave the teak three generous coats of the Clear product and used a whole quart between us. By lunchtime, the job was finished. The wood already looks great, and it is lovely to see the repairs, cleaning and finishing come together.

Amanda made a feta salad for lunch. By Sunday afternoon, she was on deck reading her book and I was catching up with things on the internet. A good moment to stop and appreciate what we had achieved.

6 November 2026Before the final treatment.
8 November 2026Repaired, cleaned and treated with Semco Clear.

Life between the jobs

Friday evening took us out for an ahi tuna burger and chips. On Saturday, we went shopping for the usual collection of boat bits, along with a few things to make life aboard more comfortable.

One purchase was a three-inch memory-foam mattress layer. Our current arrangement has a four-inch mattress and a two-inch topper, which leaves me short of footroom. The plan is to try the new three-inch layer with the existing topper and gain an inch of space. We will see how comfortable it proves.

Amanda also found some clothes, table mats and a cheerful set of galley knives. Back aboard, she treated the sprayhood roof with a full can of waterproofing spray to tackle a slight leak.

The fish we bought for Saturday’s dinner was less successful. As soon as it started cooking, a strong ammonia smell made it clear that it was off. We threw it away and went to Fisherman’s Sushi instead. An unplanned evening out, but a much better dinner.

7 November 2026An unplanned evening out after a change of dinner plans.

Next week: inside the boat

Headlinings are the big job for next week, with plenty of filling and smaller tasks to fit around them. A small leak at the bathroom hatch also needs attention; I suspect the hatch will need lifting and rebedding.

The lights have been ordered, along with other bits due to arrive next week. I am also putting together the phase-two electrical order for the Raymarine backbone and the equipment that will connect to it. We are waiting for the sailmaker’s contact in Hong Kong to hear back from the factory in China, so perhaps next week will bring news on the sails.

There is still mast work ahead. The main needs an aerial cable and a power cable, and the mizzen needs its VHF/AIS aerial cable. There are messengers in both masts, although we have yet to find out how useful they will be. I also need to make a mounting arrangement to lift the main mast navigation light above the truck, with provision for a small burgee-halyard block, and fit a Windex on each mast.

For now, though, I am taking a week off climbing. I must have been up and down the masts fifteen or twenty times this week, and it is tiring. Two coats on the mizzen, the main track fitted and the teak finished: that is a good week’s work. We are getting there.